99-03 Ford Long Lead Injector

$451.00

SKU: 9903AEPSDNEW Category: Tag:

Description

 

99-03 Ford Long Lead Injector

Brand new Alliant Power Ford 7.3 Powerstroke injector.  3 year unlimited mileage warranty

  

This injector is designed to go in the #8 (drivers side rear) cylinder of your 99-03 Powerstroke if and only if your truck came with one from the factory.  There will never be a time when you order more than one of these injectors.

Additional information

Weight 5.00 lbs
Dimensions 12 × 9 × 6 in
CORE CHARGE

Brand

Dynomite Diesel

Reviews

There are no reviews yet.

Be the first to review “99-03 Ford Long Lead Injector”

Your email address will not be published. Required fields are marked *